Project Timeline

September 

  • Tower
    • Complete construction
    • Wash mortar
    • Place crosses on tower faces
    • Complete electrical work 
    • Consecrate and install bells
    • Install stained glass windows
    • Complete lightning protection
  • Landscaping
    • Spray wash church buildings

October

  • Terrace Projects
    • Complete walls
    • Build foundation and floors
    • Install granite steps
    • Install handrails
  • Tower
    • Install Saint Bridget Mosaic
  • Landscaping
    • Install outdoor lighting 
    • Plan new landscaping

November

  • Completion Projects
    • Complete checklist items
    • Bless the bell tower and terrace 

Two Entrances Available 

All doors facing Three Chopt Road will be inaccessible during construction. 

Snowball Lane Entrance

  • Handicapped accessible
  • Snowball Lane is the one-way alleyway accessed off of York Street near the school playground that runs behind the school building.
  • A walkway up Snowball Lane will be established to provide a clear path from the front to the double doors off Snowball Lane into the Commons.
  • No parking will be allowed on Snowball Lane to allow for passage of walkers; school drop-off and pickup will continue to take place each day.

School Parking Lot Entrance

  • Handicapped accessible
  • This entrance is always accessible to pedestrians. 
  • Pedestrians can walk through the Rectory Garden or through the Clergy Parking Lot behind the rectory. 
  • This parking lot is accessible to cars only when the gates are open and the school is not using the blacktop.

Parking

Unavailable During Construction

  • Across from the church, an area for materials and equipment and will be cordoned off reducing parking capacity.
  • Parking spaces directly across from the church along the curb will be cordoned off for passage of materials and equipment to/from the work area.

Available Parking
Please be considerate of our neighbors, especially during this time.

  • York Rd., Across from the rectory and from Snowball Ln. south to Grove Ave.
  • School Blacktop (before summer break) will be available weekends and after 6 p.m.
  • School Blacktop (during summer break) will be available 24 hours.
  • School Parking Lot off of snowball lane
  • The service road which parallels Three Chopt Rd. west of York Rd. 

Handicapped Parking

  • Handicapped Parking will be reserved with signage in two locations
    • Along Snowball Lane, East of the double doors
    • On the School Parking Lot, weekends and weeknights after 6 p.m
  • Please consider arriving early and if possible, drop off any passengers at the double doors off Snowball Lane and then proceed to park.

School Drop-off and Pickup

  • Drop-off and pick-up will still continue via Snowball Lane
  • Watch for Construction workers and activity, extra care must be taken during school days at drop-off and pick-up.
  • Watch for pedestrians on the walking path that will exist on Snowball Lane during the construction period
  • Construction workers will take great care at all times, but especially during the drop-off and pick-up.
  • Any parking on Snowball (east of the double doors) during this time will be handicapped parking. 

 

 

Questions or Comments

Please contact the following individuals:

Pat Ross
Buildings and Grounds Director,  (804) 402-5480

John McCulla
Project Coordinator, (804) 306-2488

Pledging and Donating Inquiries:
Kimberly Lapkin
Director of Stewardship, (804) 525-7888
kimberly@saintbridgetchurch.org

Contact Info

Saint Bridget Catholic Church
6006 Three Chopt Road
Richmond, Virginia 23226

Office & Clergy: (804) 282-9511
Fax: (804) 285-7227
parishmail@saintbridgetchurch.org

Office Hours
Mon-Fri: 9 a.m. - 3:45 p.m. 

We are closed 12:30-1:30 p.m. for lunch.

 

 

Our Sponsors

eTEC Mechanical Corporation

Parish Pictures
IMG_1065
IMG_3557
IMG_3542
IMG_3358